Installation of structural concrete for new kiln line for bulk processing and production of cement powder products to extend the lifespan of this facility for a minimum of 50 more years.

Work area located in close proximity to and within the operational limits of the existing cement production plant. Project requirements include multiple mass concrete pours over 1,200 m³ in volume; most foundations are located on bedrock or concrete piles.

Client: LafargeHolcim


Engineering Firm: Con Engineers, Woodbridge, Ontario


Duration: February 2014 – September 2016


Volume of Concrete: 20,000m³


Crew size: 100


Unique features: The work area is located in close proximity to and within the operational limits of the existing cement production plant. Project requirements include multiple mass concrete pours over 1,200m³ in volume; most foundations are located on bedrock or concrete piles.