Ore Sorter Project – Exshaw
Duration: 4 months
Crew size: 10
Highlights:
- 800m³ concrete
- Construction of conveyor line boosting annual output capacity to over 470,000 tonnes of screened limestone
- Construction of 20′ high concrete bunker walls with protective steel wear rail embeds