Installation of structural concrete foundations and grout for the construction of a new Concentrator at Greenfield Gold/Copper Open Pit Mine to allow production of 30,000 tons per day.
Client: Imperial Metals Corporation
Engineering Firm: AMEC, Vancouver, BC
Duration: 14 months
Crew size: 70