Shake and Fence Line Expansion – Swan Valley
Duration: 4 months
Crew Size: 15
Highlights:
- 1800m³ concrete poured
- Integral hardener added to floor slab concrete
- Installation of steel driven piles for secondary building foundation
- Included site earthworks scope: excavation, backfill and utilities