Vat Upgrade Project
Duration: 5 months
Crew Size: 16
Highlights:
- Accelerated schedule to minimize mill shut down time
- 300m3 of suspended slab work
- Installation of large steel embedded frames
- Demolition of existing vats
Duration: 5 months
Crew Size: 16
Highlights: